Our Service

Solar PV System One-Stop Solution

We provide professional solar PV system one-stop solution with customized, high-quality services for different scenarios

PV System Full Process Service

Provide one-stop solar PV system services including customized solution design, on-site survey, cost calculation, core equipment production, standardized construction and full-life O&M with remote monitoring, on-site maintenance and spare parts support

Solution Design

Conduct a professional on-site investigation to understand the actual project situation. Design customized solar photovoltaic solutions for different scenarios and provide accurate cost calculations to ensure an economically and reliable system planning.

On-site survey and inspection

Professional cost calculation and budget evaluation

Customized photovoltaic system solutions

PV Equipment Supply

We independently manufacture core photovoltaic equipment with stable quality and reliable performance, supported by a mature global supply chain to ensure timely delivery and stable supply for projects worldwide.

Independent production of core PV equipment

All-scenario photovoltaic products

Stable global supply chain guarantee

Engineering & Construction

Our experienced and professional engineering team implements strict standardized construction management to ensure construction quality, safety, and progress, achieving fast and reliable project delivery.

Professional construction team

Standardized construction process

Efficient and on-time project delivery

Operation & Maintenance Managemen

Provide full-life cycle O&M services for full-scenario PV systems, including remote monitoring, on-site maintenance, spare parts supply and professional training to ensure stable and efficient operation.

Remote real-time monitoring

On-site inspection and maintenance

Spare parts supply

Professional technical training and support

Comprehensive PV Operation & Maintenance Services

Remote Monitoring

Real-time monitoring and fault early warning via cloud platform

On-site Maintenance

Global service network for fast response and on-site troubleshooting

Spare Parts Supply

Local warehouses ensure timely and stable spare parts supply

Training Support

Professional O&M training for customers to improve self-operation capacity

PV System FAQ

Solution Selection: How to select the appropriate photovoltaic-storage-chethmic microgrid solution based on the specific scenario?
Off-Grid Household

Small-scale solar-storage-diesel system (5–20kW PV + 10–50kWh energy storage + 5–15kW diesel generator), providing reliable and quiet power for daily household use with high safety.

Agriculture / Palm Plantations

Medium-to-high power solution (50–500kW PV + 50–200kWh energy storage + 50–200kW diesel generator), ensuring 24/7 operation of irrigation and processing equipment.

Mining / Industry

Industrial-grade high-power solution (100kW–5MW PV + 200kWh–5MWh energy storage + 200kW–2MW diesel generator), supporting heavy-duty equipment and resistant to extreme environments.

Commercial & Industrial / Factories

C&I solar + energy storage + millisecond-level switching system (100kW–10MW PV + 100kWh–10MWh energy storage + 100–1000kW diesel generator), guaranteeing uninterrupted production.

Temporary Camps / Construction Sites

Containerized solar-storage-diesel units (20–200kW PV + 50–200kWh energy storage + 20–200kW diesel generator), enabling fast deployment and plug-and-play operation.

Off-Grid Household

Investment: 50,000–200,000 RMB

Annual savings: 10,000–30,000 RMB

Payback period: approximately 3–7 years, and can be shortened to 2–5 years in remote areas

Agriculture / Palm Plantations

Investment: 500,000–5,000,000 RMB

Annual savings: 100,000–1,000,000 RMB

Payback period: approximately 3–6 years, and can be reduced to 2–4 years with stable production and increased income.

Mining / Industry

Investment: 2,000,000–50,000,000 RMB

Annual savings: 500,000–5,000,000 RMB

Payback period: approximately 3–5 years, and can be further shortened by avoiding shutdown losses.

Commercial & Industrial / Factories

Investment: 1,000,000–100,000,000 RMB

Annual savings: 500,000–10,000,000 RMB

Payback period: approximately 2–5 years, and can be compressed to 1.5–3 years with green incentives.

Temporary Camps / Construction Sites

Investment: 200,000–2,000,000 RMB

Leasing is available for short-term projects.

For long-term projects (>2 years), the payback period is about 2–4 years

Off-Grid Household

Overall period: about 2–4 weeks

(Design: 1–3 days + Production & Transportation: 7–15 days + Installation: 3–7 days)

Agriculture / Palm Plantations

Overall period: about 6–14 weeks

(Design: 1–2 weeks + Production & Transportation: 2–4 weeks + Installation: 2–8 weeks)

Mining / Industry

Overall period: about 4–9 months

(Design: 2–4 weeks + Production & Transportation: 4–8 weeks + Installation: 8–24 weeks)

Commercial & Industrial / Factories

Overall period: about 3–6 months

(Design: 2–3 weeks + Production & Transportation: 3–6 weeks + Installation: 4–12 weeks + Acceptance: 2–4 weeks)

Temporary Camps / Construction Sites

Overall period: about 1–3 weeks

(Design: 1–3 days + Prefabrication & Transportation: 1–2 weeks + Deployment: 3–7 days)

Emergency projects can be completed within 1 week.

Grid Connection

Grid-tied projects comply with local grid codes and pass grid connection testing and acceptance.

Off-grid projects meet electrical safety standards, with compliant design for grounding, lightning protection, etc

Environmental Requirements

Core equipment holds environmental certifications such as CE, IEC.

Diesel generators meet local emission standards, with low-sulfur diesel and exhaust treatment systems preferred.

Approval Process

Submit feasibility study and Environmental Impact Assessment (EIA) in advance to obtain construction permits and operation filing.

Large-scale projects participate in energy bidding or PPP procedures to secure policy support.

滚动至顶部