Solar PV System One-Stop Solution
We provide professional solar PV system one-stop solution with customized, high-quality services for different scenarios
PV System Full Process Service
Provide one-stop solar PV system services including customized solution design, on-site survey, cost calculation, core equipment production, standardized construction and full-life O&M with remote monitoring, on-site maintenance and spare parts support

Solution Design
Conduct a professional on-site investigation to understand the actual project situation. Design customized solar photovoltaic solutions for different scenarios and provide accurate cost calculations to ensure an economically and reliable system planning.
On-site survey and inspection
Professional cost calculation and budget evaluation
Customized photovoltaic system solutions
PV Equipment Supply
We independently manufacture core photovoltaic equipment with stable quality and reliable performance, supported by a mature global supply chain to ensure timely delivery and stable supply for projects worldwide.
Independent production of core PV equipment
All-scenario photovoltaic products
Stable global supply chain guarantee


Engineering & Construction
Our experienced and professional engineering team implements strict standardized construction management to ensure construction quality, safety, and progress, achieving fast and reliable project delivery.
Professional construction team
Standardized construction process
Efficient and on-time project delivery
Operation & Maintenance Managemen
Provide full-life cycle O&M services for full-scenario PV systems, including remote monitoring, on-site maintenance, spare parts supply and professional training to ensure stable and efficient operation.
Remote real-time monitoring
On-site inspection and maintenance
Spare parts supply
Professional technical training and support

Comprehensive PV Operation & Maintenance Services

Remote Monitoring
Real-time monitoring and fault early warning via cloud platform

On-site Maintenance
Global service network for fast response and on-site troubleshooting

Spare Parts Supply
Local warehouses ensure timely and stable spare parts supply

Training Support
Professional O&M training for customers to improve self-operation capacity
PV System FAQ
Solution Selection: How to select the appropriate photovoltaic-storage-chethmic microgrid solution based on the specific scenario?
Off-Grid Household
Small-scale solar-storage-diesel system (5–20kW PV + 10–50kWh energy storage + 5–15kW diesel generator), providing reliable and quiet power for daily household use with high safety.
Agriculture / Palm Plantations
Medium-to-high power solution (50–500kW PV + 50–200kWh energy storage + 50–200kW diesel generator), ensuring 24/7 operation of irrigation and processing equipment.
Mining / Industry
Industrial-grade high-power solution (100kW–5MW PV + 200kWh–5MWh energy storage + 200kW–2MW diesel generator), supporting heavy-duty equipment and resistant to extreme environments.
Commercial & Industrial / Factories
C&I solar + energy storage + millisecond-level switching system (100kW–10MW PV + 100kWh–10MWh energy storage + 100–1000kW diesel generator), guaranteeing uninterrupted production.
Temporary Camps / Construction Sites
Containerized solar-storage-diesel units (20–200kW PV + 50–200kWh energy storage + 20–200kW diesel generator), enabling fast deployment and plug-and-play operation.
Cost Calculation: What is the project payback period?
Off-Grid Household
Investment: 50,000–200,000 RMB
Annual savings: 10,000–30,000 RMB
Payback period: approximately 3–7 years, and can be shortened to 2–5 years in remote areas
Agriculture / Palm Plantations
Investment: 500,000–5,000,000 RMB
Annual savings: 100,000–1,000,000 RMB
Payback period: approximately 3–6 years, and can be reduced to 2–4 years with stable production and increased income.
Mining / Industry
Investment: 2,000,000–50,000,000 RMB
Annual savings: 500,000–5,000,000 RMB
Payback period: approximately 3–5 years, and can be further shortened by avoiding shutdown losses.
Commercial & Industrial / Factories
Investment: 1,000,000–100,000,000 RMB
Annual savings: 500,000–10,000,000 RMB
Payback period: approximately 2–5 years, and can be compressed to 1.5–3 years with green incentives.
Temporary Camps / Construction Sites
Investment: 200,000–2,000,000 RMB
Leasing is available for short-term projects.
For long-term projects (>2 years), the payback period is about 2–4 years
Implementation Period: How long does it take from design to commissioning?
Off-Grid Household
Overall period: about 2–4 weeks
(Design: 1–3 days + Production & Transportation: 7–15 days + Installation: 3–7 days)
Agriculture / Palm Plantations
Overall period: about 6–14 weeks
(Design: 1–2 weeks + Production & Transportation: 2–4 weeks + Installation: 2–8 weeks)
Mining / Industry
Overall period: about 4–9 months
(Design: 2–4 weeks + Production & Transportation: 4–8 weeks + Installation: 8–24 weeks)
Commercial & Industrial / Factories
Overall period: about 3–6 months
(Design: 2–3 weeks + Production & Transportation: 3–6 weeks + Installation: 4–12 weeks + Acceptance: 2–4 weeks)
Temporary Camps / Construction Sites
Overall period: about 1–3 weeks
(Design: 1–3 days + Prefabrication & Transportation: 1–2 weeks + Deployment: 3–7 days)
Emergency projects can be completed within 1 week.
Imploes it take from design to commissioning?
Grid Connection
Grid-tied projects comply with local grid codes and pass grid connection testing and acceptance.
Off-grid projects meet electrical safety standards, with compliant design for grounding, lightning protection, etc
Environmental Requirements
Core equipment holds environmental certifications such as CE, IEC.
Diesel generators meet local emission standards, with low-sulfur diesel and exhaust treatment systems preferred.
Approval Process
Submit feasibility study and Environmental Impact Assessment (EIA) in advance to obtain construction permits and operation filing.
Large-scale projects participate in energy bidding or PPP procedures to secure policy support.